State Certified Septic Systems
We install concrete septic tanks and also poly tanks depending on the specific needs of the system. We install all types of onsite sewage facilities and are licensed by Texas Commission on Environmental Quality as installers as well as site and soil evaluators.
Our History
In 1996, we started installing septic systems as Weatherford Construction in the Northern Texas Panhandle, serving Dumas, Hartley, Dalhart, Cactus, Stratford, Borger, Fritch, Stinnett, Morse, Gruver, Spearman, Perryton, Pampa and all areas between.
A merge between Weatherford Construction and Nex-Gen Dirt Work took place during 2014, which greatly expanded our ability to serve you.
A merge between Weatherford Construction and Nex-Gen Dirt Work took place during 2014, which greatly expanded our ability to serve you.
We Recommend
We recommend having your septic tank pumped and cleaned a minimum of every three years. The purpose of a septic system is to treat the organics in the wastewater before it reaches the soil. The tank, when maintained properly, utilizes natural bacteria to digest organics before leaving the tank.
From Experience
In 2006 we discontinued the use of panel type systems due to our experience of seeing the panels settle into the ground and also the lack of secondary treatment of the waste water. We now use a leach field product called EZ-Flow or pipe and gravel. When using panels the wastewater goes directly from the tank, through the panel and to the soil. Our system provides a second level of wastewater treatment by the action of bacteria that lives on the material in the leach field. This secondary treatment greatly extends the life of a leach field by reducing the bio mat in the soil surrounding the leach field. Excess growth of bio mat in the soil is one of the main causes premature system failure.
Our Goal
Our goal is to provide you with a quality, long lasting septic system utilizing our experience of over 20 years and more than 1000 systems installed.